New Industry Creation Hatchery Center (NICHe) 2 was completed in New Campus.
According to the design cord of the new campus, the facade design emphasized the lengthwise direction using the scratch tile.
And this building consists of flexible laboratories which can cope with various studies and comfortable refreshment spaces .